2017 Kemano T2 Road Works


Project Name: Kemano T2 Road Works

Client: Hatch

General Contractor: Daudet Creek Contracting

Date: April 2017 to November 2018

Contract: Unit Price

Value: $5,000,000-9,999,999

Scope: This project required the on site production of 40,000 m3 aggregate, disposal of ~12,000 m3 of waste rock and fill, and ~216,000 m3 of clearing and grubbing (10km access roads and landing). Horetzky Access Road works included: channel excavation, rip rap supply and place, and the installation culverts; localized road excavation, fill, grading, ditch re-establishment, and signage.  Service installation along the access road included the supply and install of 11,000 m direct-bury and >700 m bedrock installation in conduit (using blasting method) of 3c 350 kcmil 25kV HVTC power cable and FO cable with 19 pull boxes. In addition to clearing and grubbing, site preparation at Horetzky Landing included site grading of 3 camp/laydown pads. Works also included pothole repairs, grading, and resurfacing in the Kemano townsite. 

Challenges: Remote location with barge access only, and wildlife protection.



"As the design engineers for the new Forceman Ridge Waste Management Facility and Thornhill Transfer Station, Sperling Hansen Associates have had the privilege to work with Daudet Creek Contracting on two large earthwork projects. Both were completed efficiently, on budget and to a very high standard with minimal change orders..."