2017 South Landfill Closure


Project Name: South Landfill Closure

Client: Rio Tinto

General Contractor: Daudet Creek Contracting

Date: April 2017 to January 2019

Contract: Unit Price

Value: $1,000,000-4,999,999

Scope: Preliminary layout and survey, slope and upper landfill covering with construction of a swale and perimetre road. Side slope and upper surface works included: final sub-grade grading and sloping (vegetation removal, detailed grading, and compaction); the supply and install gas venting, bituminous geomembrane liner, synthetic drainage material, topsoil, and hydroseed/shrub cover on slopes. Decommissioned 8 wells and supply and install settlement plate, vibrating wire, and monitoring well materials. Supply and install final sub-grade road crush for perimeter road, swale with cocomat, and upper landfill.

Challenges: Environmentally sensitive area.



"As the design engineers for the new Forceman Ridge Waste Management Facility and Thornhill Transfer Station, Sperling Hansen Associates have had the privilege to work with Daudet Creek Contracting on two large earthwork projects. Both were completed efficiently, on budget and to a very high standard with minimal change orders..."