2018 Walkway Reconstruction


Project Name: Walkway Reconstruction

Client: District of Kitimat

General Contractor: Daudet Creek Contracting

Date: May 2018 to January 2019

Contract: Unit Price

Value: $1,000,000 to 4,999,999

Scope: Excavate and remove 290m of existing sidewalk materials, supply and place new sub-base and base aggregate, and install 1101m of 1.8-2.45 m wide sidewalk, including 19m concrete curb & gutter.  Prepare new sidewalk sites and supply and install 412m of 2.45 m walkway, including 35m concrete curb & gutter and 135m vertical concrete curb, with 529m underground conduit & wiring, 23 walkway lights, 17 trees, 1 bench, 16 concrete bullnose barriers and drainage features (culverts, storm leads catch basin, ditch inlet and manhole).  Landscape and hydroseed disturbed areas.

Challenges: Traffic and pedestrian management.



"As the design engineers for the new Forceman Ridge Waste Management Facility and Thornhill Transfer Station, Sperling Hansen Associates have had the privilege to work with Daudet Creek Contracting on two large earthwork projects. Both were completed efficiently, on budget and to a very high standard with minimal change orders..."