Blackberry Estates Sub Division Development

Site preparation and service installation for a 34-lot subdivision, including earthworks, installation of underground services (water, sanitary & storm sewer, power), preparation for paving and/or concrete work (road, sidewalk and curb & gutter), and building site excavation, backfilling, and landscaping.

Strawberry Meadows Rural Phase 8

Excavation, aggregate import and 1.2 km of paved road preparation for a 40-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).

Strawberry Meadows Rural Phase 9

Site clearing and grubbing, excavation, aggregate import and 800 m of paved road preparation for a 35-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).

Strawberry Meadows Rural Phase 10

Site clearing and grubbing, excavation, aggregate import and 800 m of paved road preparation for a 20-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).

Strawberry Meadows Rural Phase 11

Site clearing and grubbing, excavation, aggregate import and 800 m of paved road preparation for a 42-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).

Terrace Heights Sub-Division

Site preparation included the stripping and removal of existing organics and pavement, and cut-to-fill for the roadway. Civil work included the supply, install and test complete underground water–storm–sewer systems (12 connections), and excavate and backfill trenches for underground electrical. Aggregate was imported for backfilling driveways, roadways, curbs and sidewalks, which were then compacted and prepared for paving.