250-632-4831
admin@daudetcreek.com

Project

Project: Anode/Alumina Hauling
Client: Rio Tinto
General Contractor: Viking Construction
Date: June to October, 2016
Contract: Time & Materials
Value: $5,000,000-$9,999,999

Hauled ARS reject anodes, cathode sealing anodes, ABF anodes, APP contingency green anodes and alumina on site. Transferred bath bags and unloaded tankers.

© 2022 Daudet Creek Contracting Ltd. All Right Reserved.
Proudly Designed Locally by Spruce Tree Media Ltd. 
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram