Prepared concrete management and storage areas by clearing and removing organic burnable materials, as well as grading of both areas. Some staging of waste concrete was required, and a concrete wall and liner was removed. Asbestos was segregated and disposed of separately. Approximately 45,000 m3 of concrete was pulverized to 150 mm, and rebar was magnetically separated for recycling.