Clearing, grubbing, and stripping; construct temporary and permanent access roads and working pad; supply and install 2 new storm manholes and 1 new storm sewer chamber with an energy dissipater; install rip-rap at new outfall location; supply and install 71m storm sewer pipe; supply and construct ~225 m3 gravel cover and reconstruct ~270 m3 slope where failure had occurred; and, supply and install 53m replacement sanitary main including bypass pumping.