250-632-4831
admin@daudetcreek.com

Project

Project: First Call Electrical Upgrades
Client: BC Hydro
General Contractor: First Call
Date: May to July, 2017
Contract: Time & Materials
Value: $0-$499,999

Excavate electrical trench and install and backfill vault and duct bank.

© 2022 Daudet Creek Contracting Ltd. All Right Reserved.
Proudly Designed Locally by Spruce Tree Media Ltd. 
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram