Site development included the removal of overburden, site survey, screening and stockpiling aggregate, and sub-grade earthworks (including the excavation and relocation of 154,000 m3 of material and 128,000 m3 controlled density berm fill). Road, swale and trench grading. Supply and install HDPE discharge pipes, concrete manholes, metal gates and lockblock walls were supplied and installed.