Site preparation included clearing and grubbing, the demolition and disposal of an existing structure, and foundation preparation for the new building, including the installation of underground drainage, a manhole, and a retaining wall. Civil works included the installation of 210 m twinned 150mm sewer line, the supply, installation, testing and chlorination of a 150mm C900 water main, and new fire hydrant.