In preparation for the construction of a new feast hall and recreation centre, test holes were excavated and a roadway with water erosion control and bank armouring was constructed to the worksite. Clearing, grubbing, and burning as well as drilling, blasting, grading and bank armouring were done to level the building and parking sites. Underground sewer and water main services were run alongside the road up to the building site. Throughout the project, waste at the dumpsite and dust were managed.