Reconstruction of 3 commercial parking lots, including the excavation and disposal of existing asphalt and base material, replacement with structural fill, and compaction to prepare for paving. This was one of the first external projects on which the GPS equipment was used to quickly and accurately slope the parking lots for the desired drainage without using survey stakes.