Demolition and disposal of existing structures. Earthworks, including the removal of 12,000 m3 of unsuitable material and its replacement with 11,500 m3 of structural fill, and underground storm–sewer–water installation for new hotel. Built an MSE wire wall and landscaped the surroundings.