Project: Thornhill Transfer Station
Client: Regional District of Kitimat–Stikine
General Contractor: Viking Construction
Date: May 2016 to January 2017
Contract: Unit Price
Value: $5,000,000-$9,999,999

Earthworks comprised the construction of drainage and access systems, including grading and compaction as well as the installation of culverts, manholes, downspouts, rain-water leads, rip rap, and ditching. Interior and exterior retaining walls, foundations and concrete floors were constructed, and structural fill, geogrid, and drain rock were supplied and placed for the transfer station and organics buildings. Scale foundations were also constructed and a change room with washroom was supplied and placed. Sanitary lines were installed, and we assisted in electrical conduit and light pole installations. 1” minus crush was supplied and installed on driving surfaces and roads, and selected areas were prepared for paving.

© 2022 Daudet Creek Contracting Ltd. All Right Reserved.
Proudly Designed Locally by Spruce Tree Media Ltd. 
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram