Various underground Process/Fire water leak repairs and valve replacements. Scope included engineering for stoppage of water and mitigation plan, followed by locating, excavating, investigating and repairing/replacing leaking isolation valves and fire hydrants. Insta-valve insertion valves and single line stops were employed as needed.