Project

Project: Walkway Reconstruction
Client: District of Kitimat
General Contractor: Daudet Creek Contracting
Date: May 2018 to January 2019
Contract: Unit Price
Value: $1,000,000-$4,999,999

Excavate and remove 290m of existing sidewalk materials, supply and place new sub-base and base aggregate, and install 1101m of 1.8-2.45 m wide sidewalk, including 19m concrete curb & gutter; prepare new sidewalk site and supply and install 412m of 2.45 m walkway, including 35m concrete curb & gutter and 135m vertical concrete curb, with 529m underground conduit & wiring, 23 walkway lights, 17 trees, 1 bench, 16 concrete bullnose barriers, and drainage features (culverts, storm leads catch basin, ditch inlet and manhole); landscape and hydroseed disturbed areas.