Road reconstruction included 92,000 m2 stripping and stockpiling of topsoil, 69,000 m3 excavation, the supply and placement of granular road and sidewalk base (35,410 m2), 29,000 m2 asphalt preparation and placement. Roadway work also included supply and placement of 30 (750 m) culverts, 3 manhole bases, 16 manhole and tee risers, 53 lamp standards, and roadway signage. Service installation included the supply and install of: 328 m watermain installation and backfill; 226 m sanitary sewer pipe installation and backfill. Screened native topsoil and hydroseeding of 58,000 m2.