250-632-4831
admin@daudetcreek.com

Projects

We have completed projects throughout the years. We have worked on many project with different specifications in many different conditions. The quality of the work that we have completed always exceeds expectations. We have lead many projects as well as worked with many other companies. Here are some of the projects that we have completed.

Haisla Nation Housing Project

Prime Contractor: Yellowridge Construction LTD
Scope: • Mobe/ de mobe• Supervision• Geotechnical consultant• Stripping site .300 deep• Excavation of all foundations• Backfill of all foundations• Supply of structural fill• Slab thickenings where required• Perforated perimeter drains• Elevator shaft sump, Precast only (mechanical by others)• Simplex sump, Precast only (mechanical by others)• Sediment sump, Precast only• Excavation and backfill of under […]
Learn More

CGL Pipeline ROW Aggregate Supply & Delivery

Prime Contractor: Coastal Gas Link-TC Energy
Scope: Supply and deliver -/+ 50,000 Metric Tonnes of aggregate to the CGL pipeline right of way
Learn More

Kitimat Snow Removal

Project Type:
Prime Contractor: Daudet Creek Contracting
Clearing snow from municipal parking lots, and sanding and salting as needed.
Learn More

Miscellaneous Commercial and Residential Snow Removal

Project Type:
Prime Contractor: Daudet Creek Contracting
Clearing snow from commercial parking lots and residential driveways, and sanding and salting as needed.
Learn More

School District Snow Removal

Project Type:
Prime Contractor: Daudet Creek Contracting
Clearing snow from school parking lots, and sanding and salting as needed.
Learn More

General Services Contract / Hourly Works

Project Type:
Prime Contractor: Daudet Creek Contracting
Miscellaneous general works, including (but not limited to): loading and hauling equipment and materials, slot filter replacement, bank and bridge repairs, waterline repairs, sweep and grade roadways, roadway and pothole repairs, Kildala road works, supply and deliver winter chips and salt, storm clean-up and grading at various RT sites (e.g., Kemano, helipad, recycling yard), helipad […]
Learn More

Barge Loading and Unloading

Project Type:
Prime Contractor: Daudet Creek Contracting
Stevedore services for Kitimat, Kildala and Kemano barges.
Learn More

Civeo Snow Removal

Project Type:
Prime Contractor: Daudet Creek Contracting
Clearing snow from roadways, parking lots and sidewalks, and sanding and salting as needed.
Learn More

Green Coke Hauling

Project Type:
Prime Contractor: Daudet Creek Contracting
Supply teamsters and trucks for periodic on-site hauling of coke from the barge hopper to the coke pile.
Learn More

Anode/Alumina Hauling

Project Type:
Prime Contractor: Viking Construction
Hauled ARS reject anodes, cathode sealing anodes, ABF anodes, APP contingency green anodes and alumina on site. Transferred bath bags and unloaded tankers.
Learn More

Carbon Hauling

Project Type:
Prime Contractor: Daudet Creek Contracting
Supply teamsters for on-site hauling of carbon blocks from APP to ARS.
Learn More

Kemano Works

Project Type:
Prime Contractor: Frontier-Kemper Aecom JV
Misc works, including clearing, grading, and packing of a 15,000 m2 camp pad; trenching for electrical, gas and sewer; installation of waterline, placement of  ~4000 m3 aggregate, barge loading & unloading, and general camp pad setup
Learn More

Anode Hauling & Sweeping

Project Type:
Prime Contractor: Viking Construction
Hauling anode blocks on site.
Learn More

Haisla Boulevard Tree Removal

Project Type:
Prime Contractor: Daudet Creek Contracting
Clear, grub and mulch approx. 3 hectares.
Learn More

Blackberry Estates Sub Division Development

Prime Contractor: J. Oviatt Contracting
Site preparation and service installation for a 34-lot subdivision, including earthworks, installation of underground services (water, sanitary & storm sewer, power), preparation for paving and/or concrete work (road, sidewalk and curb & gutter), and building site excavation, backfilling, and landscaping.
Learn More

Strawberry Meadows Rural Phase 8

Prime Contractor: J. Oviatt Contracting
Excavation, aggregate import and 1.2 km of paved road preparation for a 40-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).
Learn More

Strawberry Meadows Rural Phase 9

Prime Contractor: Daudet Creek Contracting
Site clearing and grubbing, excavation, aggregate import and 800 m of paved road preparation for a 35-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).
Learn More

Strawberry Meadows Rural Phase 10

Prime Contractor: Daudet Creek Contracting
Site clearing and grubbing, excavation, aggregate import and 800 m of paved road preparation for a 20-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).
Learn More

Strawberry Meadows Rural Phase 11

Prime Contractor: Daudet Creek Contracting
Site clearing and grubbing, excavation, aggregate import and 800 m of paved road preparation for a 42-lot rural subdivision, installation of underground services and connections (municipal water and low-pressure sewer).
Learn More

Terrace Heights Sub-Division

Prime Contractor: Daudet Creek Contracting
Site preparation included the stripping and removal of existing organics and pavement, and cut-to-fill for the roadway. Civil work included the supply, install and test complete underground water–storm–sewer systems (12 connections), and excavate and backfill trenches for underground electrical. Aggregate was imported for backfilling driveways, roadways, curbs and sidewalks, which were then compacted and prepared for paving.
Learn More

Aggregate Supply

Prime Contractor: Daudet Creek Contracting
Supply +/- deliver >10,000 m3 aggregate, as well as miscellaneous hauling of materials.
Learn More

Leavitt Equipment Mobilization

Prime Contractor: Daudet Creek Contracting
Mobilization of rental equipment to and from clients.
Learn More

Minette Bay Substation Aggregate Supply & Delivery

Prime Contractor: Daudet Creek Contracting
Supply and deliver 52,555 m3 aggregate and remove and dispose of 22,000 m3 peat moss offsite.
Learn More

Concrete Hauling

Prime Contractor: Daudet Creek Contracting
Load, haul, and dispose of approx. 7400 m3 concrete offsite.
Learn More

LNGC Aggregate Hauling

Prime Contractor: Progressive Ventures
Deliver aggregate for LNGC marine offset habitat construction.
Learn More

Methanex Site Remediation

Prime Contractor: Daudet Creek Contracting
Concrete foundations were demolished and removed from site, and contaminated soil was remediated.
Learn More

Concrete Crushing

Prime Contractor: J. Oviatt Contracting
Prepared concrete management and storage areas by clearing and removing organic burnable materials, as well as grading of both areas.  Some staging of waste concrete was required, and a concrete wall and liner was removed.  Asbestos was segregated and disposed of separately.  Approximately 45,000 m3 of concrete was pulverized to 150 mm, and rebar was […]
Learn More

Glacier Concrete Site Demolition

Prime Contractor: Daudet Creek Contracting
Demolition and removal of existing structures and concrete foundations, as well as the removal of all remaining materials (e.g., aggregate, lock blocks, etc.).
Learn More

Kemano Fuel Facilities

Prime Contractor: Daudet Creek Contracting
Upgrades to the fuel facilities included all engineering plans and drawings for the decommissioning and replacement of 4 single-wall fuel tanks, base, and slab with 3 double-walled fuel tanks on a new gravel base with a concrete-rebar slab and steel bollards.  Decommissioning work also included installation of a new oil/water separator  manual valve (client preference), […]
Learn More

Kemano Road Reconstruction

Project Type:
Prime Contractor: J. Oviatt Contracting
Road reconstruction and widening from the Kemano powerhouse to Horetzky road (elevations 1600–2900 m), including: 9500 m2 clearing and grubbing; 9,000 m2 gradework; 277 m supplied and placed culverts; 5,600 m ditching; 6175 m3 sub-base; supplied and placed jersey barriers and rock filled gabion baskets along 80% of the road length; constructed new MSE wire […]
Learn More

Kitimat Road Reconstruction

Project Type:
Prime Contractor: J. Oviatt Contracting
Reconstruction of 3 commercial parking lots, including the excavation and disposal of existing asphalt and base material, replacement with structural fill, and compaction to prepare for paving. This was one of the first external projects on which the GPS equipment was used to quickly and accurately slope the parking lots for the desired drainage without […]
Learn More

Kitimat Walkway Reconstruction

Project Type:
Prime Contractor: Daudet Creek Contracting
Reconstruction of 2 sidewalk sections totaling 430 m, including removal of 5300 m2 existing sidewalks, catch basins, storm leads and curbs. Ecavate 2200 m3 to sub-grade, place structural fill and compact.  Supply and install new catch basins, manholes, and ditch inlet structures. Re-grade and landscape swale drainages.  Permanent pavement restoration of affected driveways, walkways, and […]
Learn More

Kemano Misc Road Repairs

Project Type:
Prime Contractor: Daudet Creek Contracting
Kemano Tower 17 Quarry & Road Repairs: Clear and strip site, and build access road for new quarry. Drill and blast to product 5,000 m3 rip rap for placement at Tower 17 and to repair roadway at 8.5 km. Loading, hauling, and placing gravel for road/shoulder repairs due to river bank erosion and flooding at […]
Learn More

Thornhill Sewer Phase Two

Prime Contractor: Daudet Creek Contracting
Supplied and installed 4200 m of partially insulated twin line force sewer main including emergency by-pass port, bends, in-line gate valves & air valve chambers, 40 sanitary service connections, 30 sanitary service tie-ins, 41 trenchless crossing tie-ins, terminal clean-out chambers, pressure sustaining valve chambers, 400 mm and 500 mm CSP culverts, and emergency by-pass ports. […]
Learn More

Gitanmaax Water Main

Prime Contractor: Opus DaytonKnight Consultants
Work included clearing and grubbing prior to the supply and install of 842 m of 150 mm water main alongside an existing 300 mm water main. Check and gate valves were also supplied and installed.
Learn More

First Call Electrical Upgrades

Prime Contractor: First Call
Excavate electrical trench and install and backfill vault and duct bank.
Learn More

Bish Creek HDPE Upgrades

Prime Contractor: Tervita
Supply and install 10" HDPE pipe and fittings between Ponds A & B.
Learn More

UG Process & Fire Water Leak Repairs

Prime Contractor: Daudet Creek Contracting
Various underground Process/Fire water leak repairs and valve replacements. Scope included engineering for stoppage of water and mitigation plan, followed by locating, excavating, investigating and repairing/replacing leaking isolation valves and fire hydrants. Insta-valve insertion valves and single line stops were employed as needed.
Learn More

Kitamaat Village Road Washout Repairs

Prime Contractor: Nechako Northcoast Construction
Emergency repairs to washouts and exposed gas lines for the single access road to Kitimaat Village, including: local asphalt and bedrock removal, installation of culverts, import and export of aggregate, re-bury gas lines, cleaning ditches, shoulder repair, and rip rap and filter cloth placement.
Learn More

Walkway Reconstruction

Prime Contractor: Daudet Creek Contracting
Excavate and remove 290m of existing sidewalk materials, supply and place new sub-base and base aggregate, and install 1101m of 1.8-2.45 m wide sidewalk, including 19m concrete curb & gutter; prepare new sidewalk site and supply and install 412m of 2.45 m walkway, including 35m concrete curb & gutter and 135m vertical concrete curb, with […]
Learn More

Haisla Water System Upgrade

Prime Contractor: Daudet Creek Contracting
Upgrades to municipal water system, including preparation and installation of TCB building, reservoir works & well reconditioning.  Excavate and supply aggregate fill.  HDPE installation, including fusing, sanitizing, flushing, testing gate valves and anchor bolts.  Sanitary line installation and tie-ins.  Oversee drilling & blasting, mechanical, electrical, and concrete works by sub-contractors.
Learn More

Arch Culvert Installation

Prime Contractor: Daudet Creek Contracting
Supply and install 2 arch culverts into marine causeway; grade causeway, build stone steps from causeway into water.
Learn More

Dunn Street Outfall and Sewer Replacement

Prime Contractor: Daudet Creek Contracting
Clearing, grubbing, and stripping; construct temporary and permanent access roads and working pad; supply and install 2 new storm manholes and 1 new storm sewer chamber with an energy dissipater; install rip-rap at new outfall location; supply and install 71m storm sewer pipe; supply and construct ~225 m3 gravel cover and  reconstruct ~270 m3 slope […]
Learn More

Fairfield Hotel Civil Works

Prime Contractor: Daudet Creek Contracting
Roads and grading work, including supply and install approx. 3000 m3 aggregate, 4760 m2 asphalt paving, 640 m curb & gutter, 490 m2 concrete sidewalks, and concrete block wall. Supply and install site services, including re-locate hydrant, 33 m water service and tie-in, and 46 m sanitary service and manhole. Supply and install site drainage, […]
Learn More

KMP Construction Camp

Prime Contractor: J. Oviatt Contracting
Site preparation for a 1500-person camp, included: 26,000 m3 cut and fill; 124,000 m2 compacting and grading; 5600 m ditching, supply and place 32,500 m2 geotextile and 330 m culverts; 2 oil water separators, and storm water drainage system (590 m SDR35 pipe, 16 catch basins, and 6 manholes).  Pipe and service installation work included […]
Learn More

KMP Anode Bake Furnace

Prime Contractor: J. Oviatt Contracting
Site preparation for the anode baking furnace requiring the excavation of 43,500 m3 unsuitable material, on-site screening of 10,775 m3 aggregate, and placement and compaction of 30,400 m3 for a new building. Site drainage work included: dewatering; local supply and place of geotextile and rip rap; excavated drain and ditch; 322 m perforated HDPE pipe; […]
Learn More

Sitka Lodge Site Preparation 1

Prime Contractor: J. Oviatt Contracting
Prepare sub-base and final surface for a paved curb and gutter intersection, including final landscaping. Clearing and burning 8000 m3 timber, followed by excavation and disposal of overburden off site in preparation for the construction of a 2500-person lodge-style camp.
Learn More

New-Build Microtel Hotel

Prime Contractor: Daudet Creek Contracting
Demolition and disposal of existing structures. Earthworks, including the removal of 12,000 m3 of unsuitable material and its replacement with 11,500 m3 of structural fill, and underground storm–sewer–water installation for new hotel. Built an MSE wire wall and landscaped the surroundings.
Learn More

Sitka Lodge Site Preparation 2

Prime Contractor: J. Oviatt Contracting / Daudet Creek Contracting
Site preparation for roadways, parking lots, and drainage ponds included the clearing and stripping of organic materials and on site cut-to-fill. Earthworks included the removal of 20,000 m3 of unsuitable material and its replacement with 18,000 m3 of sub-grade structural fill in these areas. Underground utilities (force main sewer, municipal water, fire protection water) and electrical trenching […]
Learn More

Northwest Regional Airport Apron

Prime Contractor: Progressive Ventures
Grading and compacting the new base for a third airplane apron. This was the first external project that our GPS equipment was used on, and it greatly increased the efficiency of the fine grade work that was required for this project.
Learn More

Haisla Nation Feast Hall

Prime Contractor: Daudet Creek Contracting
In preparation for the construction of a new feast hall and recreation centre, test holes were excavated and a roadway with water erosion control and bank armouring was constructed to the worksite. Clearing, grubbing, and burning as well as drilling, blasting, grading and bank armouring were done to level the building and parking sites. Underground sewer […]
Learn More

Forceman Ridge Landfill

Prime Contractor: Daudet Creek Contracting
Site development included the removal of overburden, site survey, screening and stockpiling aggregate, and sub-grade earthworks (including the excavation and relocation of 154,000 m3 of material and 128,000 m3 controlled density berm fill).  Road, swale and trench grading. Supply and install HDPE discharge pipes, concrete manholes, metal gates and lockblock walls were supplied and installed.
Learn More

Thornhill Transfer Station

Prime Contractor: Viking Construction
Earthworks comprised the construction of drainage and access systems, including grading and compaction as well as the installation of culverts, manholes, downspouts, rain-water leads, rip rap, and ditching. Interior and exterior retaining walls, foundations and concrete floors were constructed, and structural fill, geogrid, and drain rock were supplied and placed for the transfer station and […]
Learn More

Haisla Centre

Prime Contractor: Kerkhoff Construction
Several small projects were addressed at this site, including: curb and sidewalk preparation with Nilex underlay; playground, road and parking lot gradework +/- drainage pipes; installation of light standards, manholes and risers; construction of a retaining wall; supply and install of aggregate and topsoil; and, correction of issues on a pre-existing deficiency list (grouting manholes, […]
Learn More

Gingolx Water Treatment Plant

Prime Contractor: Wildstone Construction and Engineering
Site preparation included clearing and grubbing, the demolition and disposal of an existing structure, and foundation preparation for the new building, including the installation of underground drainage, a manhole, and a retaining wall.  Civil works included the installation of 210 m twinned 150mm sewer line, the supply, installation, testing and chlorination of a 150mm C900 […]
Learn More

Kemano T2 Road Works

Prime Contractor: Daudet Creek Contracting
This project required the on site production of 40,000 m3 aggregate, disposal of ~12,000 m3 of waste rock and fill, and ~216,000 m3 of clearing and grubbing (10km access roads and landing). Horetzky Access Road works included: channel excavation, rip rap supply and place, and the installation culverts; localized road excavation, fill, grading, ditch re-establishment, […]
Learn More

South Landfill Closure

Prime Contractor: Daudet Creek Contracting
Preliminary layout and survey, slope and upper landfill covering with construction of a swale and perimetre road. Side slope and upper surface works included: final sub-grade grading and sloping (vegetation removal, detailed grading, and compaction); the supply and install gas venting, bituminous geomembrane liner, synthetic drainage material, topsoil, and hydroseed/shrub cover on slopes. Decommissioned 8 […]
Learn More

Jack Talstra Way Road Reconstruction

Prime Contractor: Allnorth Consultants
Road reconstruction included 92,000 m2 stripping and stockpiling of topsoil, 69,000 m3 excavation, the supply and placement of granular road and sidewalk base (35,410 m2), 29,000 m2 asphalt preparation and placement. Roadway work also included supply and placement of 30 (750 m) culverts, 3 manhole bases, 16 manhole and tee risers, 53 lamp standards, and […]
Learn More

Kemano HDPE & Aggregate

Prime Contractor: Frontier-Kemper / Aecon JV
Preparation for the T2 camp pad included: supply 58,300 m3 specified aggregate for sub-base and base; excavate, compact and grade camp laydown areas and access roads; trench, install and backfill 1889 m of HDPE utility pipes; supply, place, and finish insulated concrete-rebar slabs.  Vegetation on the airfield was also cleared and disposed of.
Learn More

Kemano Emergency Repairs

Prime Contractor: Daudet Creek Contracting
Emergency road washout on the Powerline road, the Tower 26 road, and construct an emergency berm along Horetsky Creek.
Learn More

Riverbrook Estates Site Preparation

Prime Contractor: Daudet Creek Contracting
Clear, strip, and move 22,500 m2 pre-load to phase 2 in preparation for multi-family residential development.
Learn More

Haisla Health Centre

Prime Contractor: Ledcor CMI Ltd
Site preparation including ~6800 m3 excavation, ~2660 m3 fill and ~1700 m3 structural fill, gradework, and landscaping. Install storm, sewer and water services to site.
Learn More

Sitka Lodge Expansion - Underground Mechanical Install and Site Gradework

Prime Contractor: Daudet Creek Contracting
Supply and install sanitary sewer lines, manholes, water line (potable and firewater), electrical services and gas line for temporary camp, and 20-dorm expansion. Install compacted gravel bases, ramps, culverts, walkways and asphalt aprons for new dorms. Build delivery access road and fuel tank pad. Install 135,000L buried sanitary tank including connections and anchorage. On-site snow […]
Learn More

Lagoon Siphon

Prime Contractor: Viking Construction
Clearing, grubbing and leveling for site access, and base and receiving pit preparation, including: relocate pump and hydrovac, and excavation to expose and grade outlets and sewer line.  Supply, deliver and install aggregate and geotextile where needed. Sewer diversion and pipe fusing, and supply and install new stormline. Excavate and backfill for casing installation and […]
Learn More

Fairfield Hotel Foundation

Prime Contractor: Daudet Creek Contracting
Site survey, excavate 1460 m3 for foundation, and supply and install 484 m3 fill. Supply and install service sleeves for power and communication conduits under footings. Build perimeter drainage. Supply, form and install concrete foundation, including reinforcement, anchor bolts, footings, slab on grade, finishing, walls, columns insulation, damp proofing and drainage mat and vapour barrier. […]
Learn More
© 2022 Daudet Creek Contracting Ltd. All Right Reserved.
Proudly Designed Locally by Spruce Tree Media Ltd. 
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram