Preparation for the T2 camp pad included: supply 58,300 m3 specified aggregate for sub-base and base; excavate, compact and grade camp laydown areas and access roads; trench, install and backfill 1889 m of HDPE utility pipes; supply, place, and finish insulated concrete-rebar slabs. Vegetation on the airfield was also cleared and disposed of.